Greenville Central School District

Thursday, February 4, 2016

Weather Project Due Friday, 2/12

Weather Log Project
What you need to do:
1)    Using your weather log, graph temperature, wind speed and relative humidity on the graph paper provided (you may get poster board or something larger to present the data if you choose).
2)    On the graph paper, label the “X” axis with the date and the “Y” axis with the item you are graphing (example: temperature, humidity, wind speed).  You will need two sheets of graph paper to log each item.
3)    Graph all 28 days information on the graph paper to represent the 3 items you will be graphing.
4)    Using a ruler or other straight edge, connect all the points.


Projects are due on Friday, February 12

No comments:

Post a Comment