Weather
Log Project
What you need to do:
1) Using
your weather log, graph temperature, wind speed and relative humidity on the
graph paper provided (you may get poster board or something larger to present
the data if you choose).
2) On
the graph paper, label the “X” axis with the date and the “Y” axis with the
item you are graphing (example: temperature, humidity, wind speed). You will need two sheets of graph paper to
log each item.
3) Graph
all 28 days information on the graph paper to represent the 3 items you will be
graphing.
4) Using
a ruler or other straight edge, connect all the points.
Projects
are due on Friday, February 12
No comments:
Post a Comment